If yes, complete the following: (May be included as an attachment):
(i) Option Item 0001 shall be the addition of the following, complete in accordance with
the requirements specified hereinafter:
________________________________________________________________
________________________________________________________________
(ii) Option Item 0002 shall be the addition of the following, complete in accordance with
the requirements specified hereinafter:
________________________________________________________________
________________________________________________________________
________________________________________________________________
How long of a period, in days, will the option to award be for?__________________
________________________________________________________________
Also, will the option item effect the construction period of the contract?
Yes ____ No ____
If so, explain (Take into consideration the effect of it being awarded (1) with the original
bid, (2) at any time during the specified option period, or (3) at the end of the specified
option period):
________________________________________________________________
________________________________________________________________
________________________________________________________________
6. Reference FAR 52.236-4, Physical Data
Is physical data (e.g. test borings, hydrographic, weather conditions data, etc.) to be
furnished or made available to offerers? Yes_______
No_______
If yes, fill in applicable data:
a. The indications of physical conditions on the drawings and in the specifications are
the result of site investigations
by________________________________________________________________
(insert description of investigative methods used, such as surveys, auger borings, test
pits, probing, test tunnels, etc.)
EXHIBIT 8-B
157