a. Design Phase:
(1) 100% Submittal: Shall include all Drawings which are a part of the 100%
submittal package and shall include all Deliverables and Documentation
described in Items 3 and 4 above, including all corrections required as a
result of Government Review.
(2) Final Submittal: Shall include all Drawings which are a part of the Final
submittal and shall include all Deliverables and Documentation described
in Items 3 and 4 above, including all corrections required as a result of
Government Review.
b. Construction Contract Support Services Phase: The A-E shall update all CADD
drawing and database files to reflect project as-built conditions as indicated by
the record documents kept by the construction contractor at the job site. Upon
completion of the construction project, all updated computer files as described
above shall be delivered to the government in the formats and media described
above.