Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


ATTACHMENT C
CODE CRITERIA SEARCH:
Date:
Project Title:
Location:
A-E Contract No.:
Name of the A-E Firm:
A-E Firm Contact:
Tel:
Project Leader:
Tel:
REFERENCES:
MIL-HDBK-1008C: Dated 10 JUNE 1997
APPLICABLE NATIONAL FIRE CODES (N.F.C) (Latest Edition)
UNIFORM BUILDING CODE (Latest Edition)
NAVFAC Policy and Design Planning Statements and or Design Policy Letters
CONSTRUCTION CRITERIA BASE (CCB) (Latest Edition)
(MIL-HDBK-1008C, Policy and Design Planning Statements and Design Policy Letters
supersede NFPA & UBC Requirements where addressed)
1. USE OR OCCUPANCY AND GENERAL BUILDING LIMITATIONS (MIL-HDBK-1008C
AND UBC CHAPTERS 3,4,& 5):
1.1
Use:
1.2
Occupancy Group(s) (UBC Table 3-A):
1.3
Type of Construction (MIL-HDBK-1008C & UBC Table 5-B) :
1.4
Allowable Area:
Basic Allowable (UBC Table 5-B):
s.f (s.m)
Multi-Story Increase (UBC Sec. 504.2):
Subtotal:
s.f (s.m)
Yard Increase (UBC Sec. 505.1):
Two Sides:
(  - 20)1.25% = 50% max
s.f (s.m)
Three Sides:
(  - 20)2.5% = 100% max
s.f (s.m)
211








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business