e. All panels, switchboards, motor control centers, transformers and other major
electrical loads such as M.G. sets, A/C chillers, etc.
7.4.8.5 Floor Plans
a. Lighting Plan(s). Show a building's full floor plan (first, second, etc.). These
plans shall show the layout and type of fixtures to be used for all types of lighting
systems.
b. Power Plan(s). Show a building's full floor plan (first, second, etc.). The power
plans shall show the location of receptacles, panelboard(s), switchboards, motor
control centers, transformers and any other major equipment throughout the inside
of the building or project.
c. Communication/Signal Plan(s). Show building's full floor plan (first, second, etc.)
with the location of devices and hardware/accessories. These plans shall show the
following:
1.
Telephone
2.
Intercom
3.
Local Area Networks (LAN)
4.
Closed Circuit Television (CCTV)
5.
Others as required
6.
Fire Protection System(s)
7.4.9 Fire Protection System(s)
Show existing and proposed fire alarm boxes and circuits. Show sizes of existing and
proposed water mains, risers and fire hydrant locations. Show separation distance from
adjacent buildings.
7.5 PROJECT DRAWINGS - 100 PERCENT SUBMITTAL
Project drawings shall be complete and camera ready for reproduction and
advertisement with all elements thoroughly checked by the A-E . After all Quality
Control checking is completed, the check-set with all correction marks, shall become part
of the A-E's 100% submittal to the Command. Drawings and specifications shall contain
the same terminology. SOUTHWESTNAVFACENGCOM reserves the right to
advertise and award the construction documents at the 100 percent submittal
stage.