Custom Search
|
|
|
||
PAGE______OF______
Rate the following factors according to their importance (e.g., 1-2-3-etc.)
in designing and installing an alarm system:
_______
Initial cost
_______
Ease of maintenance
_______
_______
Floor space requirements
_______
Ease of understanding how
_______
Ease of reconfiguring or
to operate the system
modifying
_______
Ease of physically
_______
Ease of expansion/modularity
operating the system
_______
Response time
_______
Compatibility with existing
or proposed procedures
_______
Amount of operator
_______
System listed in approved
fatigue produced
equipment catalog
_______
Amount of information
_______
Recommendations from others
which is presented
_______
Ease of interpreting the
_______
Degree of line security
information that is
_______
Protection-in-depth
displayed
_______
Probability of detection
_______
Equipment best satisfies
technical requirements
_______
Low false/nuisance alarm
_______
Low profile/cosmetics
rate
_______
Ease of retrofit
_______
Single/Multiple Operator(s)
Other:__________________________
_____________________________________
__________________________
_____________________________________
Who will operate the system? _______________________________________________
____________________________________________________________________________
____________________________________________________________________________
Who will maintain the system?_______________________________________________
What constraints does this work force
present?_________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
What types of training aids will be required?
Printed Manuals_________________________________________________________
Lectures__________________________ Slides/Movies________________________
Equipment/Operations demo. and practice_________________________________
Familiarization_________________________________________________________
Factory/Vendor training_________________________________________________
Who will conduct the training?______________________________________________
Is training budgeted?_______________________________________________________
How long?______________________________Minimum______________Maximum_________
Comments____________________________________________________________________
|
||