Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


MIL-HDBK-419A
2.2.2.4 Survey Form.
FACILITY
GROUNDING, BONDING, AND SHIELDING
Date
Facility
Location
Inspector
PART I - EARTH ELECTRODE SUBSYSTEM
Configuration (Sketch or attach drawing):
A.
Identify:
B.
Grounding Conductor Size and Length
Rod Size and Length
Grounding Conductor Composition
Ground Wells (Yes/No)
Interconnecting Cable Size
Ground Wells (Size/Type)
Interconnecting Cable Depth
C.
Bonds:
Poor
Excellent
Good
General Condition:
Unacceptable
Specific deficiencies
(See also Part II, Bonds)
2-24








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business