MIL-HDBK-419A
Determine and record connections to earth electrode subsystem:
4.
Connection
Location
Length and Size of Cable
Equipment Safety Ground (Schematic or description of safety network):
B.
(On above diagram (or on the engineering drawings) indicate wire sizes,
connection points, use of conduit, cable tray connections, etc.)
Stray Current Measurements:
c.
Current Reading
Location
2-30