Custom Search
|
|
|
||
MIL-HDBK-419A
PART VI - FACILITY SHIELDING (Designated rf Barrier)
Inspection Checklist:
A.
Initial
1.
Check personnel barriers for mechanical strength, signs of damage,
and proper grounding (if metallic).
Insure that all shields around high voltage apparatus are properly
2.
labeled.
Check electromagnetic shields for adequate bonding.
3.
Inspect all electromagnetic shields for holes or openings added since
4.
last inspection. Check to see that such openings are properly
covered with screening or covers.
Inspect power line and signal line filters on wires entering shielded
5.
areas for proper peripheral grounding.
Inspect cable shield pigtails for excessive length.
6.
Inspect rf connectors for tightness, evidence of corrosion, or
7.
physical damage.
Ensure that all grounding conductors penetrating a designated rf
8.
barrier are peripherally bonded to barrier.
Note Deficiencies Below:
B.
Deficiency
Corrective Action Taken
Location
2-53
|
||