MIL-HDBK-419A
3.7.8 Instrumentation System.
Generally inspect analog systems for conformance with the recommendations presented in Section
a.
3.5.2.1.
Inspect the grounding networks of digital data systems for conformance with the recommendations
b.
of Section 3.5.2.2.
3.7.9. EMP Design.
Has the potential threat of an EMP event been considered in the design of the equipment? (Note
a.
that most of the measures for EMP protection are also effective against lightning.) Have measures been taken
to reduce magnetic pickup (see Volume I, Chapter 10)?
Has extra emphasis been devoted to providing effective magnetic shields over potentially
b.
susceptible devices and components?
Are components and devices having high degrees of immunity to EMP (and lightning) surges used
c.
where possible?
Are all incoming and outgoing conductors adequately protected with fast acting transient protective
d.
devices?
3.7.10 Other Observations. As appropriate, note the existence of any personnel hazards due to deficiencies of
grounding, bonding, or shielding under Part VI of the Inspection Form. If appropriate to the intended use of the
equipment, determine what type of lightning surge protection, if any, is provided on signal, control, or power
lines associated with the equipment. Record all observations under Part VI of the Form.
3.7.11 Inspection Form.
EQUIPMENT
GROUNDING, BONDING, AND SHIELDING
Equipment Type
Manufacturer
Date
Inspector
3-50