Figure 2-11. Two Anchor Chain Subassemblies Overboarded
Stopper the chain, 3 links below the chain joining link, and lower the
chain joining Iink to the deck for disassembly,
q
When severed, move this shot of chain aside.
q
Sling the chain and continue lifting and detaching chain shots as before.
NOTE
All components recovered should be washed down
with seawater before being brought aboard the
barge. Use a high-pressure hose for this purpose (see
Figure 2-12).
When all of the chain has been recovered, bring the anchor aboard.
q
Pick up a retriever buoy and, using the same procedures, recover a
q
second subassembly and anchor. Then recover the third.