TABLE 4-2-6A
(cont'd)
Step
Task
3
Design filling area:
a. Select landfilling method based on:
(1)
Site
topography and slopes
(2)
Site
soils
(3)
Site
bedrock
(4)
Site
b. Specify design dimensions:
(1)
Trench width, depth, length
(2)
Cell size
(3)
Cell configuration
(4)
Trench spacing
(5)
Fill depth
(6)
Interim cover soil thickness
(7)
Final cover soil thickness.
c. Specify operational features:
(1)
Use of cover soil
(2)
Method of cover application
(3)
Need for imported soil
(4)
Equipment requirements
(5)
(6)
Asbestos burial area
(7)
Special waste disposal.
4
Design facilities:
a.
Leachate controls
b.
Gas controls
c.
Surface water controls
d.
Access roads
e.
Special working areas
f.
Structures
g.
Utilities
h.
Fencing
i.
Lighting
j.
Washracks
k.
Monitoring wells
1.
Landscaping
m.
Debris control
n.
Methane collection and controls
o.
Liner and leak detection system
p.
q.
Scales.
4-46