TABLE 4-2-6A
(cont'd)
Step
Task
5
Prepare design package:
a. Develop preliminary site plan of fill areas
b. Develop landfill contour plans
(1)
Excavation plans - including benches
(2)
Sequential fill plans
(3)
Completed fill plans
(4)
Fire, litter, vector, odor and noise controls.
c. Compute solid waste storage volume, soil requirement volumes,
and site life
d. Develop final site plan showing:
(1)
Local area
(2)
Normal fill areas
(3)
Special working areas
(4)
Leachate controls
(5)
Gas controls
(6)
Surface water controls
(7)
Access roads
(8)
Structures
(9)
Utilities
(10)
Fencing
(11)
Lighting
(12)
Washracks
(13)
Monitoring wells
(14)
Landscaping
(15)
Debris or litter controls
(16)
Prevailing winds.
e. Prepare elevation plans with cross sections of:
(1) Excavated fill
(2) Completed fill
(3) Phased development of fill at interim points.
f. Prepare construction details:
(1)
Leachate controls
(2)
Gas controls
(3)
Surface water controls
(4)
Access roads
(5)
Structures
(6)
Monitoring wells
(7)
Debris or litter controls.
4-47