placement of meters today allows the identification and charging of individual
users. Items to take into consideration when planning for metering system are:
Sufficient money to monitor the desired number of circuits.
q
Staff with time and qualifications to read meters.
q
Placement of conductors for efficient connection to potential and
q
current transformers.
Loads that cannot be shut down for meter installation.
q
Placement of meters for easy access in safe locations.
q
Design engineers knowledgeable in metering system requirements.
q
Training of maintenance personnel.
q
Funding for maintenance and spare parts.
q
Cross reference method to determine need for meter calibration.
q
2.3 Standards. Energy consumption standards can be developed from historical
data. Once a standard has been set, periodic monitoring and plotting may
reveal a variance that requires further investigation.