Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


placement of meters today allows the identification and charging of individual
users.  Items to take into consideration when planning for metering system are:
Sufficient money to monitor the desired number of circuits.
q
Staff with time and qualifications to read meters.
q
Placement of conductors for efficient connection to potential and
q
current transformers.
Loads that cannot be shut down for meter installation.
q
Placement of meters for easy access in safe locations.
q
Design engineers knowledgeable in metering system requirements.
q
Training of maintenance personnel.
q
Funding for maintenance and spare parts.
q
Cross reference method to determine need for meter calibration.
q
2.3 Standards. Energy consumption standards can be developed from historical
data. Once a standard has been set, periodic monitoring and plotting may
reveal a variance that requires further investigation.
9-2








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business