NORMAL
REVISED
REV  DURA-
DURA-
NO.
WORK TOTAL IN
NO.
TION
TION
STEP DESCRIPTION
STEP CEN- HOURS
IN
TIME
TIME
CREW
TER
(HOURS) CREW (HOURS)
120
Fixtures, outside procurement
120
120
1
time
56
Navy stock, lead-time
56
56
2
20
Build partitions
4
40
2
3
01
80
4
28.5
New panel, E.M.T., Wiring
57
114
2
4
21
2
31.5
Steam pipes (access area)
31.5
63
2
5
15
3
29
Paint exterior building
29
3
02
87
6
24
Water pipes (access area)
24
1
24
1
11
7
38
Sand floor and lay tile
114
6
2
228
8
01
14.2
Paint ceilings
9
3
42.7
03
129
9
9
21.2
Paint walls
63.6
02
191
3
10
6
6.5
Install light fixtures
19.5
2
11
21
39
5.5
2
5.5
Install radiators
11
2
12
15
5
Install water coolers
1
1
5
4.5
11
13
2
4
Clean up
8
8
1
14
32
FIGURE A-8
Final Step List