Sheet for each phase, work authorization/estimate continuation sheet, and a
work authorization/estimate summary sheet for each job. The work
authorization/estimate sheet includes a line entry of craft costs, based on
local wage rates, for each phase. The estimate sheet also displays the total
number of EPS and non-EPS hours estimated. FEJE also permits establishment of
local Task Time Standards. Interfaces with work input control, scheduling,
and memorandum accounting systems are possible.