MO-327 CHG 94-01
the contractor has submitted work schedules in accordance with
the provisions of the contract.
4-240 Work Requirements Subject to Surveillance.
In many
instances a contract requirement will generate several work
requirements, as shown in the PRS, Figure 4-1.
single work requirement may on occasion provide a reliable
indication of the contractor's performance of an entire contract
The inspection of the work may be carried out as it
requirement.
is performed, or the inspection may be based on the examination
of the records documenting the work.
Inspection of all work performed is
Work Performed.
(a)
This
the most thorough method of evaluating performance.
requires the QAE be at the work site during performance of the
work or shortly thereafter if results of work performed are
visible (janitorial, grounds, etc.).
69.1