4-630 Sequential Numbering - Unscheduled Services.  Unscheduled services
are numbered sequentially when the service is performed.
Example:  The service calls listed below were performed in January 1988,
on the date indicated. The last service call for the preceding month
(December 1987) was 106.  The service calls are numbered sequentially as
Shown below.
Sequential Numbering Unscheduled Services.
Population
Number
Date
1
107
1
108
2
109
5
110
7
111
7
112
7
113
8
114
12
115
13
116
13
117
16
118
18
119
..............
..............
29
202
29
203
30
204
4-700 (QUALITY ASSURANCE PLAN - SURVEILLANCE GUIDES.
4-710 (General. A series of surveillance guides have been developed in
outline form to assist in the preparation of SGs when 100 percent
inspection, planned sampling, random sampling, or validated customer
complaints are used as the method of surveillance.
4-720 100 Percent Inspection.  When 100 percent inspection is used the
sampling schedule corresponds to the schedule of the work as actually
carried out by the contractor, with every item of work being inspected .