RSED
PAYMENT
WORK REQUIREMENTS
CALCULATION
RESPONSE CLASSIF- COST
QUALITY
TIME
ICATION
ACCTNG WORK
a.
Price for work requirement
$3600
$600
$600
$7,200
b.
Population
600
600
600
600
$6
$1
$1
c.
Price per service (a/b)
$12
d.
No. of services sampled
60
60
60
60
e.
No. in sample rejected
6
5
4
2
f.
Observed defect rate (e/d)
10.00%
8.33%
6.66%
3.33;
g.
Adjustment factor *
1.31%
1.17%
0.90%
1.38%
h.
Defect rate (f-g) **
7.02%
8.62%
5.49%
2.43%
i.
Extrapolated defects
32
14
51
(b x h as whole number)
42
3
j.
Defects obs. out&side sample
2
2
2
7
7
k.
0
Rework by contractor
N/A
0
l.
Rework by Govt. or Others
0
4
N/A
25
m.
Net no. services to deduct
51
35
10
at scheduled price (i-k-l)***
$306.00 $35.00
$25.00 $120.00
n.
Extrapolated deduction
(c x m)
o.
Deduct Govt. rework
Actual cost **** or
$0.00 $0.00 $0.00 $138.00
$0.00 $0.00
$0.00
$0.00
at scheduled price (c x l)
$0.00
IDs ct rewk [10%xcx(e+j-1)]
$0.70
$0.70
$4.80
p.
ID'S Govt. rewk (20% x 0)
$0.00 $0.00
$0.00 $27.60
q.
+ $2.70 + $32.40
r.
Other adjustment *****
$0.00 + $2.70
$577.00 $6946.80
s.
Total payment
$3289.20 $567.00
(a-n-o--r)
Total payment for routine service calls = $ 11,380.00
*
Adjustment factor from Appendix F, Table 3.
**
Defect rate for comparison with MADR.
*** Cannot be less than zero.
**** Actual cost are the amounts paid to Government personnel (wages
retirement, and fringe benefits) plus materials or the actual costs
of other means by which the work is accomplished.
***** Calculation of other adjustments is shown at 6-681
FIGURE 6-4 TYPICAL PAYMENT CALCULATION WHEN RANDOM SAMPLING
FOR EXTRAPOLATED DEDUCTIONS IS USED
124