Custom Search
|
|
|
||
e.
Operating personnel review assignments and applicable
operating procedures. For long duration dives this shall
include watch-section pre-dive operational dry runs as
a unit.
f.
Repair
supply
stocks,
supporting
HAZCAT
failure
management and maintenance planning, inventoried and
verified ready for installation if needed.
Clearing of outstanding RECs and proper removal of red
tags on equipment and components.
h.
Detailed brief/indoctrination for occupants/divers.
i.
Detailed brief of all personnel prior to commencement of
hyperbaric/diving operations.
2.10
REFERENCE
MATERIALS
To assist facility managers and maintenance personnel in the
identification of applicable reference materials, Appendix A is
provided.
2-11
|
||