Custom Search
Back
Up
Sewage Ship Waste Offload Barge (SWOB)
Sewage Ship Waste Offload Barge (SWOB)
Distribution
Foreword
Table of Contents
Table of Contents -Cont.
List of Figures
List of Tables
Index
Index -Cont.
Index -Cont.
Index -Cont.
Chapter 1. Sewage Swob Mission
Figure 1-1. S-SWOB Loading
Chapter 2. S-SWOB Description
Figure 2-1 Hull Arrangement
Figure 2-2 Main Deck Arrangement
Figure 2-3 Deck House Arrangement
Figure 2-4 Pump Room Arrangement
Section 2. Power System
Figure 2-5 Electrical Schematic
Figure 2-6b Indicators
Figure 2-8. Shore Power Receptacle
Battery Power
Section 3. Aeration System
Figure 2-9 Aeration System
Figure 2-11 Tank Air Manifold
Section 4. Tank Level Indicator System
Figure 2-12 Level Sensor Stalk
Figure 2-13 Level Indicator Panel
Section 5. Cargo System
Figure 2-14 Cargo Piping
Figure 2-16 Valve Operators
Manifold Valves
Section 6. Barge Equipment
Figure 2-17 Cleaning and Ventilation Systems
Deck Drains
Chapter 3. Operating Procedures
Generator Operation
Shore Power Operation
Volt Meter
Generator Shutdown
Shore Power Shutdown
Section 2. Ship Operations
Ship Disconnections
Table 3-1 Ship Sewage Discharge Volumes and Rates
Tank Aeration
Aeration Valves
Manpower Requirements
Unmanned Operations
Section 3. Towing Operations
Section 4. Pier Operations
Tank Stripping
Disconnecting From the Pier
ManPower Requirements
Chapter 4. Sanitation and Safety
Sewage Spills
Sewage Hoses
Section 2. Safety
Gas Freeing Procedures
Gas Freeing Procedures -Cont.
Chapter 5. Preventive Maintenance
Aeration System
Table 5-1 S-Swob Planned Maintenance System
Sewage Hose and Fittings
Section 2. Barge Layup Procedures
Layup Requirements
Troubleshooting Procedures
Table 6-1 Power System Troubleshooting
Table 6-2 Cargo System Troubleshooting
Table 6-3 Aeration System Troubleshooting
Table 6-5 Tank Cleaning Troubleshooting
Chapter 7. Corrective Maintenance
Diesel Abnormal Operation
Generator
Cargo System
Aeration System
Figure 7-1 Pump Controller Wiring Schematic and Diagram
Air Manifold Balancing Procedures
Figure 7-2 Aeration Balancing Setup
Valves and Fiberglass Piping
Figure 7-3 Discfuser Modification
Figure 7-4 Air Compressor Wiring Schematic and Diagram
Figure 7-5 2-Way-2 Port Valve
Figure 7-6 3-way-2 Port Valve
Tank Level Indicator System
Painting Schedule
Anode Replacement
Table 7-1 Paint Index
Table 7-2 Paint Coating Schedule
Table 7-2 Paint Coating Schedule -Cont.
References
As Built Drawings
Component Index
Component Index -Cont.
As Built Drawings -Cont.
Application Procedure
Directions for Using Fibercast FR-240-CL Maintenance Repair Kit
Appendix B Equipment and Fittings
Special Equipment and Fittings
Figure B-1 Adapter Firehose Flushing
Figure B-4 Adapter Air Blowdown
Figure B-5 Water Manometer Design
Appendix C Operating Summary Tables
Table C-1 Operating Summary Power Systems
Table C-1 Operating Summary Power Systems -Cont.
Table C-2 Operating Summary Cargo Loading
Table C-2 Operating Summary Cargo Loading -Cont.
Table C-3 Operating Summary Cargo Offloading
Table C-4 Cargo Tank Sounding Tables
Table C-4 Cargo Tank Sounding Tables -Cont.
Table C-5 Diesel Fuel Tank Sounding Tables
Spare Parts Information
Table D-1 On Board Spare Parts (Original) Allowance
Sewage Ship Waste Offload Barge (SWOB)
Privacy Statement
-
Copyright Information.
-
Contact Us