Custom Search
 
  
 


CONTRACT REQUIREMENTS
PERFORMANCE REQUIREMENTS
(4)
(6)
(5)
(1)
(2)
(3)
STANDARD OF
MADR
WGT
CONTRACT
WORK
PERFORMANCE
REQUIREMENT
NO
REQUIREMENT
(%)
20
Attachment J-C2, Contrac-
1%
a. Completed during specified
Herbicide Treatmt..
013
tor's approved schedule
periods and as scheduled
Buildings and
(Paragraph C.9.m)
Structures
1%
30
Area extending 4" from base
b. Proper application
of exterior wall or structure
(Paragraph C.9.m)
1%
Vines, brush and similar
30
c. Vegetation removed
growth cut at base of build-
ing or structure concurrent
with herbicide application,
removed from site same day
(Paragraph C.9.m)
0%
Correct herbicide used
20
d. Proper material
(Paragraph C.7.c)
EFINITE QUANTITY REQUIREMENTS
5%
Attachment J-C7
30
a. Completed within allowed
Tree Line
(Paragraph C. 10)
time as ordered
Trimming
3%
Branches/vegetation cut
55
b. Tree trimming
below a height of 8' above
ground level, sucker growth
removed from base of tree
(Paragraph C.10.a)
3%
Diseased vegetation removed
15
c. Vegetation removed
from site same day, other
trimmed vegetation disposed
on-site per Contracting Ofcr.
(Paragraph C.1O.a)








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business