PERFORMANCE REQUIREMENTS
CONTRACT REQUIREMENTS
(5)
(6)
(4)
(3)
(2)
(1)
MADR
WGT
STANDARD OF
WORK
ITEM
CONTRACT
PERFORMANCE
REQUIREMENT
NO
REQUIREMENT
(%)
Attachment J-C7
5%
40
a. Completed within allowed
015
Tree Removal
(Paragraph C. 10)
time as ordered
5%
40
Trees, stumps and above
b. Tree removal
ground roots removed 6"
below ground level, un-
necessary ground disrup-
tion/stump holes filled,
raked, fertilized, seeded
(Paragraph C.1O.b)
20
c. Tree disposal
All debris removed from
5%
site same day
(Paragraph C.1O.b)
40
Attachment J-C7
0%
a. Completed within allowed
016
Emergent Tree/
time as ordered
(Paragraph C.10.c)
Limb Removal
40
b. Tree/limb removal
0%
Unstable/damaged/dangerous
trees or limbs removed to
restore safe condition,
ground surface damage
repaired
(Paragraph C.10.c)
c. Tree/limb disposal
20
All debris removed from
0%
site same day
(Paragraph C.10.c)