CONTRACT REQUIREMENTS
PERFORMANCE REQUIREMENTS
(1)
(2)
(4)
(3)
(5)
(6)
ITEM
CONTRACT
WORK
WGT
STANDARD OF
MADR
NO
REQUIREMENT
REQUIREMENT
PERFORMANCE
(%)
017
Stumps and Above
a. Completed within allowed
20
Attachment J-C7
10%
Ground Root
time as ordered
(Paragraph C.10)
Removal
b. Stump/root removal
60
Stumps/roots removed 6"
10%
below grade, unnecessary
ground disruption, stump
hole filled, fertilized,
raked, and seeded
(Paragraph C.10.d)
Removed from site same day
10%
20
c. Stump/root disposal
(Paragraph C.1O.d)
5%
018
Grassing
a. Completed within allowed
20
Attachment J-C7
(Paragraph C.10)
time as ordered
Filled with 2" topsoil or
5%
40
b. Quality grassing
scarified 1", graded,
raked, fertilized, seeded,
mulched, and watered
(Paragraph C.10.e)
0%
40
Correct seed. fertilizer,
c. Quality materials
and topsoil used, proof of
manufacturer's guaranteed
analysis (seed, fertilizer)
(Paragraph C.7)