Custom Search
|
|
|
||
C.
The product cannot be described because of its technically involved construction or composition.
D.
A minimum of three manufacturers are specified.
Use the following wording:
"[Product or system] shall be [model, make, etc.], as manufactured by [name and address]; or [model,
make, etc.], as manufactured by [name and address]; or [model, make, etc.] as manufactured by [name
and address] or equal."
Following this, the essential features of the product or system shall be set forth in sufficient detail to establish the
basis upon which the equality of non-listed products will be determined.
5.9.2 Finishes
When specifying building finishes, i.e., carpet, resilient tile flooring, etc., keep specifications generic. Do not list
manufacturers names in the specification, rather provide a color key (listing of manufacturers) together with the
finish schedule in the drawings. The following disclaimer shall be added:
"Patterns and colors listed by the manufacturer's name are for identification only. The listing is not
intended to limit selection of similar finish colors and patterns from other manufacturers."
5.10 Division One Sections
Division One sections contain mainly administrative requirements, therefore the Division One of most projects is
similar.
5.10.1 The following sections of Division One are required in most projects:
01110
SUMMARY OF WORK
01140
WORK RESTRICTIONS
01150
SPECIAL PROJECT PROCEDURES
01200
PRICE AND PAYMENT PROCEDURES
01310
ADMINISTRATIVE PROCEDURES
01320
CONSTRUCTION PROJECT DOCUMENTATION
or
01321
NETWORK ANALYSIS SCHEDULES
01450
QUALITY CONTROL
01500
TEMPORARY FACILITIES AND CONTROLS
01525
SAFETY REQUIREMENTS
01575
TEMPORARY ENVIRONMENTAL CONTROLS
01770
CLOSEOUT PROCEDURES
5.10.2 There are other sections in Division One which may be required depending on project conditions:
01150 SPECIAL PROJECT PROCEDURES