Custom Search
Back
Up
Engineering Field Activity Chesapeake
Engineering Field Activity Chesapeake
Record of Changes
Forward
Table of Contents
Table of Contents -Cont.
Table of Contents -Cont.
Section 1: General
Section 1: General
Definitions & Abbreviations
Design Review Comments (DRC) Program
SPECSINTACT
EFA Chesapeake Organization Chart
Engineering & Design Division Organization Chart
Errors and Negligent Performance
Construction Contract and Project Specifications Numbers
Computerized Graphic Design
Section 2: General Design Requirements
Section 2: General Design Requirements
Provision for the Handicapped
Interior Architectural Design
Criteria Resources
Basis of Design Report
Design Review Comments (DRC)
Sustainable Design
Natural and Artificial Lighting Considerations
Electrical Considerations
Section 3: A/E Contract Submission Requirements
Section 3: A/E Contract Submission Requirements
Final Concept Submission
Procedures
Design Development (35%) Submission
Contents
Progress (60%) Submission
Contract Documents (100%) Submission
Final Submission
Design/Build/Bridging (D/B/B) Submission
Draft Design/Build/Bridging Submission
Final Design/Build/Bridging Submission
Design Energy Target (DET) Compliance Check
Environmental Permits Report
Supplemental Interior Design
Post Construction Award Services (PCAS)
Soil Borings and Soils Analysis
Format
Value Engineering (VE)
Value Engineering (VE) A/E Coordinating Services
Stormwater Management
Hazardous Material Removal Report
Seismic Evaluation of Existing Buildings
Contents
Procedures
Section 4: Project Drawings
Section 4: Project Drawings
Order of Project Drawings
Fire Alarm System Design
Signatures on Project Drawings
Lettering Size
Section 5: Project Specifications
Section 5: Project Specifications
Draft Specification (60%) Submittals
Format of the 100% and Final Specification
Design/Build/Bridging Specification
Division One Sections
Specification Changes
Bid Schedule
Section 6: Cost Estimates
Section 6: Cost Estimates
Submission Requirements
Final Submission
Section 7: Instructions for A/E Invoicing
Section 7: Instructions for A/E Invoicing
Appendixes
Elements of the "Parametric Cost Estimate"
Elements of the "DD 1391 Plus"
Elements of the "DD 1391 Plus" -Cont.
FY01 Military Construction Program
FY01 Military Construction Program -Cont.
Supplemental Data
Appendix II Basis of Design Report
Mechanical
Mechanical -Cont.
Mechanical -Cont.
Electrical and Telecommunications
Electrical and Telecommunications -Cont.
Civil
Civil -Cont.
Civil -Cont.
Hazardous Materials
Fire Protection
Fire Protection -Cont.
Appendix III Interior Architectural Design and Supplemental Interior Design
Procedures
Supplemental Interior Design
Furnishings Procurement Package
Procedures
Appendix IV Metric in Design and Construction
Resources for Metric Construction
Appendix V Proposed HVAC Alternatives
Government Approval
Instructions for Completing Contractor's Invoice
Contractor Performance Statement
Contractor Performance Statement -Cont.
Header Information
Contractor's Release Under Contract
Engineering Field Activity Chesapeake
Privacy Statement
-
Copyright Information.
-
Contact Us