4)  Water and Sewer System Details:  fire hydrant
installation details with guard posts, fire pumps, water storage
tanks, backflow preventers, manhole details including modifications
to existing manholes, cleanout details, pipeline profiles, manhole,
frames and cover details, pump station details, air release details,
thrust block details, etc.
c)  Landscape Plans and Details (80% complete):  Show plans and
details indicating trees, shrubs, ground cover and turf to be
provided keyed to a plant schedule.
(Note:  Landscape maintenance is minimal at all naval installations.
Accordingly, all planting layouts should emphasize very hardy plants
which require little or no maintenance.  In addition, the spacing and
location of plant materials should be based on their mature sizes and
relationships to structures, doors, windows, utilities, etc.)
16.3.3.2
Submit the following:
Supplement the basis of design discussions as necessary and revise
the calculations, if required, to reflect resolution of previous
government review comments.
16.3.4
Final Submission
16.3.4.1  Drawings:  Submit 100% complete drawings for all portions
of the civil design as listed above, revised, if required, to reflect
resolution of previous government review comments.
16.3.4.2  Specifications:  Submit 100% complete technical
specifications, properly edited, to reflect civil design
requirements.  (See the chapter titled "Preparation of
Specifications" for format for specifications).  General guidance on
specifications is as follows:
a)  Naval Facilities Engineering Command Guide Specifications
(NFGSs) are all inclusive and must be properly edited to delete items
which do not pertain to the project.  Unique items not covered in the
NFGSs must be added.  In the absence of a suitable NFGS, the A/E
shall provide an appropriate non-proprietary technical section
properly edited for the project.
b)  Names of items used in the specifications must be identical
with the names used on the drawings.
c)
Proprietary items may not be named.
d)  Give the construction contractor as many choices of material
as possible consistent with design requirements.  Define sizes on
drawings and materials in the specifications.
e)  Reference State Department of Transportation specifications
for paving.  Use NFGS 02511 and make terminology consistent.
f)  Review referenced publications to confirm that the type,
size, and class designations used in the NFGS are the same as are
16 -