Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


used in the applicable reference publications, especially referenced
publications which have been updated since the NFGSs were issued.
g)  Assure that earthwork specifications include recommendations
contained in the soils report.
h)  Select ASTM compaction testing method and give frequency of
testing.
i)  For projects involving rock excavation, include quantities
to be used as a Basis for Bid in the contract documents using
Attachment 16A to this chapter.
16.3.4.3
Submit the following:
Supplement the basis of design discussions as necessary and revise
the calculations, if required, to reflect resolution of previous
government review comments, if any.  At this stage, the design
analysis shall be 100% complete.
16.3.5
Submission of Bidding Documents
Submit complete and corrected drawings, specifications and design
analysis as detailed above.
16 -
7








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business