Custom Search
|
|
|
||
MIL-HDBK-419A
2.3.3 Facility Maintenance Report.
Facility
Date
Inspector
Location
PART I - EARTH ELECTRODE SUBSYSTEM
Resistance Measurement:
A.
Sketch of Test Setup (Indicate Probe Locations, Spacings, etc.).
(Enter raw test data and plot resistance readings on attached form)
ohms. (Fall-of-Potential Method)
Resistance:
B.
(Note precautions set forth in Section 2.2.2.2.1)
Weather:
C.
Dry
Wet
Temperature
F
Rain
Snow
Mist
1-5 days
Days since last rainfall (or snow): Same day
5-19 days
more than 20
General Soil Moisture: Dry
Damp
Wet
Months since last measurement:
D.
Value of last measurement :
E.
Same
Higher
F.
Comparison with last measurement : Lower
2-46
|
||