Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


MIL-HDBK-419A
Inspection Checklist:
G.
Initial
Check all accessible bonds and connections for
1.
looseness, corrosion, and physical damage.
Measure stray current in grounding conductor
2.
between service disconnecting means and earth
electrode subsystem (Current reading
).
Check for additions or modifications made
3.
since last inspection. Update existing drawings.
Generally inspect facility site for changes (in
4.
vegetation, roads, parking areas, excavation,
drainage, etc.) that could cause future earth
resistance variations. Note such changes in
General Comments below.
Inspection Results or Observations.
5.
Condition or
Corrective Action Taken
Deficiency
Location
General Comments:
2-47








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business